Make the assumptions explicit. Change the inputs and see the result.
Shares only public reference information. Local profiles, inputs and imported data are not included.
Using DALBO MaxiRoll 630 Greenline
Capacity = width × speed ÷ 10 × efficiency. Duration = area ÷ capacity + extra minutes ÷ 60.
Transfers total elapsed time and field-work time separately. Field-work time is only a starting assumption for paid helper time; adjust it in the contract planner.
Use total and field-work time in manual contract planning